Similar to the previous two stages, users can perform the designated tasks for the Nursery Stage as configured.
Tasks involving the use of supplies, such as pond cleaning, disinfection, probiotics application, feeding, etc., are collectively referred to as cost-recording tasks. The supplies used are categorized by type, task, and cost to generate a detailed farming expense report, helping farmers effectively manage the costs associated with their farm operations.
In addition to predefined tasks in the system, such as pond cleaning, disinfection, probiotics application, feeding, etc., farmers can create custom tasks to comprehensively record all expenses incurred during the farming process, tailored to specific farming protocols.
For more details, refer to Task Management.
I. Adding diary tasks
The tasks may include:
Steps to Access:
![]() |
![]() |
II. Move Pond Task
After completing the nursery phase, users can transition to the Grow-Out Stage to perform tasks designated for this phase (Click “Switch pond to the grow-out stage” at the bottom of the screen).
Additionally, users can carry out the task of shrimp transfer to another pond. The detailed steps for performing this task are as follows:
![]() |
|
![]() |
2. The user fills in the required Shrimp Size. (Please measure the size using TOMOTA S3 before transferring ponds to obtain accurate shrimp size information). 3. Then, add and select the receiving ponds and enter the number of PLs being transferred. 4. Users can transfer to multiple ponds at the same time. If there are shrimp remaining in the original pond for continued farming, please enter the remaining quantity below. If transferring all shrimp to the receiving ponds, check the "Transfer all" box. (When transferring ponds, the system will allocate the cost proportions of farming in the original pond to the receiving ponds based on the actual quantity received in each pond.) |
![]() |
Select the receiving ponds and enter the number of PLs being transferred. Note: Before performing the pond transfer task, the user must open a new farming cycle for the receiving pond. (Click here to open a new cycle) If any renovation tasks are performed, enter them in the Renovation Stage first. Then move to the Stocking Stage to receive shrimp from the original pond being transferred. In this stocking stage, you do not need to perform the stocking task. Instead, simply carry out the pond transfer task from the original pond to the receiving pond. |
![]() |
5. After completion, the "Task list" tab will display tasks labeled "The cost is calculated when move pond." |